Up Front® Price
$56,783
1/35
Description
New Price -- 2024 GMC Sierra 1500 AT4X Duramax Turbo-Diesel | Luxury Off-Road Capability Meets Premium Truck Performance
Take your adventures to the next level with this 2024 GMC Sierra 1500 AT4X, a premium off-road pickup engineered to deliver exceptional capability, luxury, and efficiency. Powered by the highly sought-after Duramax 3.0L Turbo-Diesel engine, this Clean CARFAX One-Owner Sierra AT4X with No Accidents Reported combines rugged trail-ready performance with upscale comfort and cutting-edge technology.
Whether you're towing, exploring off the beaten path, or commuting in comfort, the Sierra AT4X is built to handle it all with confidence and style.
Key Features & Highlights:
Clean CARFAX One Owner
No Accidents Reported
Duramax 3.0L Turbo-Diesel Engine
AT4X Premium Off-Road Package
Off-Road Suspension System
Trailering Package
Hitch Guidance
HD Surround Vision Camera System
Forward Collision Alert
Lane Keep Assist with Lane Departure Warning
Ultrasonic Front & Rear Park Assist
Heads-Up Display (HUD)
Power Moonroof
Apple CarPlay & Android Auto Compatibility
Bose Premium Series 12-Speaker Audio System
Remote Vehicle Starter System
Remote Keyless Entry
Heated Steering Wheel
Heated Front Seats
Ventilated Front Seats
Heated 2nd-Row Outboard Seats
16-Way Power Driver Seat with Lumbar Adjustment
16-Way Power Passenger Seat with Lumbar Adjustment
18-Inch Painted Aluminum Wheels
ABS Brakes, Traction Control & Electronic Stability Control
Premium Interior Comfort
Inside, you'll find a luxury-grade cabin designed for maximum comfort. The 16-way power front seats with lumbar support, heated and ventilated front seating, heated rear outboard seats, and heated steering wheel create a first-class driving experience in every season. The premium Bose 12-speaker sound system delivers exceptional audio quality while the available Heads-Up Display keeps important information directly in your line of sight.
Advanced Safety & Driver Assistance
Drive with confidence thanks to advanced GMC safety technologies including Forward Collision Alert, Lane Keep Assist with Lane Departure Warning, HD Surround Vision, and Ultrasonic Front and Rear Park Assist. These intelligent systems help enhance awareness and provide added peace of mind wherever your travels take you.
Ford Blue Advantage: Blue Certified
This vehicle is backed by the Ford Blue Advantage Blue Certified Program, giving you added confidence with your purchase, including:
3-Month/4,000-Mile Comprehensive Limited Warranty
139-Point Inspection and Reconditioning Process
24/7 Roadside Assistance
Quality and reliability you can trust
Why Buy From Mullinax Ford?
We Want Your Trade
No Hassle, No Haggle
Up-Front Pricing
Easy, Transparent Buying Experience
Don't miss your opportunity to own this exceptionally equipped 2024 GMC Sierra 1500 AT4X Duramax Turbo-Diesel. Combining luxury, technology, off-road capability, and diesel efficiency, this Sierra is ready for work, adventure, and everything in between. Contact us today to schedule your test drive!
Take your adventures to the next level with this 2024 GMC Sierra 1500 AT4X, a premium off-road pickup engineered to deliver exceptional capability, luxury, and efficiency. Powered by the highly sought-after Duramax 3.0L Turbo-Diesel engine, this Clean CARFAX One-Owner Sierra AT4X with No Accidents Reported combines rugged trail-ready performance with upscale comfort and cutting-edge technology.
Whether you're towing, exploring off the beaten path, or commuting in comfort, the Sierra AT4X is built to handle it all with confidence and style.
Key Features & Highlights:
Clean CARFAX One Owner
No Accidents Reported
Duramax 3.0L Turbo-Diesel Engine
AT4X Premium Off-Road Package
Off-Road Suspension System
Trailering Package
Hitch Guidance
HD Surround Vision Camera System
Forward Collision Alert
Lane Keep Assist with Lane Departure Warning
Ultrasonic Front & Rear Park Assist
Heads-Up Display (HUD)
Power Moonroof
Apple CarPlay & Android Auto Compatibility
Bose Premium Series 12-Speaker Audio System
Remote Vehicle Starter System
Remote Keyless Entry
Heated Steering Wheel
Heated Front Seats
Ventilated Front Seats
Heated 2nd-Row Outboard Seats
16-Way Power Driver Seat with Lumbar Adjustment
16-Way Power Passenger Seat with Lumbar Adjustment
18-Inch Painted Aluminum Wheels
ABS Brakes, Traction Control & Electronic Stability Control
Premium Interior Comfort
Inside, you'll find a luxury-grade cabin designed for maximum comfort. The 16-way power front seats with lumbar support, heated and ventilated front seating, heated rear outboard seats, and heated steering wheel create a first-class driving experience in every season. The premium Bose 12-speaker sound system delivers exceptional audio quality while the available Heads-Up Display keeps important information directly in your line of sight.
Advanced Safety & Driver Assistance
Drive with confidence thanks to advanced GMC safety technologies including Forward Collision Alert, Lane Keep Assist with Lane Departure Warning, HD Surround Vision, and Ultrasonic Front and Rear Park Assist. These intelligent systems help enhance awareness and provide added peace of mind wherever your travels take you.
Ford Blue Advantage: Blue Certified
This vehicle is backed by the Ford Blue Advantage Blue Certified Program, giving you added confidence with your purchase, including:
3-Month/4,000-Mile Comprehensive Limited Warranty
139-Point Inspection and Reconditioning Process
24/7 Roadside Assistance
Quality and reliability you can trust
Why Buy From Mullinax Ford?
We Want Your Trade
No Hassle, No Haggle
Up-Front Pricing
Easy, Transparent Buying Experience
Don't miss your opportunity to own this exceptionally equipped 2024 GMC Sierra 1500 AT4X Duramax Turbo-Diesel. Combining luxury, technology, off-road capability, and diesel efficiency, this Sierra is ready for work, adventure, and everything in between. Contact us today to schedule your test drive!
2024 GMC® Sierra 1500
AT4X
•
36,868
miles- Up Front® Price$56,783
Basic information
Stock #
VIN
Let's get started
— or —
Schedule a test drive
Schedule a time to test drive this vehicle at our dealership.
We make it easy
Tell us about your desired payment and what you want for your trade-in vehicle.
Confirm availability
Give us your best offer for this vehicle in just a few seconds
Estimate your payment
Get a quick payment estimate based on basic loan terms.
Dealership Information
Sunday
10:00am - 6:00pm
Monday
9:00am - 7:00pm
Tuesday
9:00am - 7:00pm
Wednesday
9:00am - 7:00pm
Thursday
9:00am - 7:00pm
Friday
9:00am - 8:00pm
Saturday
9:00am - 8:00pm
2024 GMC® Sierra 1500
AT4X
•
36,868
miles- Up Front® Price$56,783